Maxim-integrated Analog Essentials Getting Started Guide for Zedboa Manual de usuario Pagina 19

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 22
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 18
Analog Essentials Getting Started Guide
19
Zedboard Version
2. Open the EDK/XMP project (Zynq Processing System /Peripherals)
a. Highlight and double-click on armSubsystem1 zynq2(zynq2.xmp)” as shown below. Changes to the
internal peripherals can be configured here. Examples of this are adding additional I
2
C ports or changing
the baud rate on the UARTs.
b. After making any changes to the Zynq Processing System within EDK, run DRC and Generate netlist, then
rebuild the ISE project to incorporate those changes into the base bitstream (toplevel.bit).
c. Re-export the design to SDK by clicking on the Export to SDK icon in the upper left menu area.
Vista de pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22

Comentarios a estos manuales

Sin comentarios